New Construction References

Perforce Software “The West Wing”
Alameda, CA
Build an 27,000 sf  extension with internal connection access to their (E) facility.   It will include 1 story of under building parking, and 2 stories of offices. The exterior and interior finishes mimic the (E) facility to make it appear as one.
Projected Completion Date: December 2008

Dong Ling Sprouts, Inc.
San Lorenzo, CA
Construction of a new 800 sq. ft. office building extensive renovation to a 38,000 sq. ft. commercial/warehouse building.
Completion Date: April 2000

Tai Lan Building
Oakland, CA
Construction of a new 30,000 sq. ft. commercial/warehouse building.
Completion Date: September 1998

Bates Building/The Numbering Company
San Francisco, CA
Construction of a new 4,500 sq. ft. commercial/ warehouse building.
Completion date: October 1997

Chimes Block Building
Tenant Improvement Project

Completion Date: December 1991

Chimes Block Building
Oakland, CA
Construction of a new 3,000 sq. ft. commercial/retail building with unique construction materials and methods.
Completion Date: December 1990

M.A.C. Building
Oakland, CA
Construction of a 4 story commercial/residential building.
Completion Date: May 1984

back to top

Tenant Improvement References

Encina Veterinary Hospital
Walnut Creek, CA
Interior tenant improvement of approximately 1900 sq. feet from a dentist office to veterinary dental care facility.
Projected Completion Date:
September 2008

Little House Cafe
Alameda, CA
Relocated a small 1904 Colonial Revival residence (2 parcels away) and will convert it to a small café keeping period details in tact: wainscoting, beam ceiling, period fixtures, etc.
This project was awarded a 2008 Architectural Preservation Award from the Alameda Architectural Preservation Society.
Completion Date: September 2007

Circuits
Alameda, CA
Converted 4000 sq. feet of former retail space into after school work-out facility for kids.
Completion Date: December 2006

East Bay Veterinary Emergency of Antioch
Antioch, CA
Features: Renovation of 4,260 sf of a former pet food store into an Emergency Veterinary Clinic.
Completion date: May 2006

Bennett & Samuelson
Alameda, CA
Features: Renovation of 10,500 sf of office.
Completion Date: March 2006

Data 911
Alameda, CA
Renovation of their office suite (approx. 15,600 sq. ft.).
Completion Date: January 2005

Perforce Software "Perfortress"
Alameda, CA
Finished shell out of Tenant Spaces A & D for future office expansion.
Design/Build: Buestad Construction and Baseline Engineering.
Completion Date: July 2004

Harbor Bay Realty
Alameda, CA
Office expansion project of 2,400 sq. ft. Completion Date: February 2003

Bel Aire Plaza
Napa, CA

Remodel of 4,500 sq. ft. of existing restaurant and dining area into a shell for a sports bat setting.
Completion date: January 2002

Law Offices of William Berg & Associates
T
Alameda, CA
Remodel of 6,000 sq. ft. of existing administrative offices. Includes voluntary seismic upgrade to the (E) structure while maintaining the historic character of the buildings muraled ceilings.
Design/Build Team: Buestad Construction, Inc. and Thruston Design Group, and Baseline Engineering
Completion Date: September 2001

Perforce Software "Perfortress"
T
Alameda, CA
Renovation of a two story, concrete tilt-up building of approximately 26,000 sq. ft. Extensive seismic retrofit completed during construction, with custom finishes throughout second floor office space.
Completion Date: "March 37th 2001" (April 7th)

Office Please, Inc.
Alameda, CA
Renovation of 14,000 sq. ft. office.
Completion Date: December 2000

Autodesk, Inc.
Alameda, CA
Renovation of 10,500 sq. ft. of office.
Completion Date: December 2000

Alameda Credit Union
Alameda, CA
Renovation of 1,500sq. ft. office.
Completion Date: November 2000

Imperial Bank
Alameda, CA
Renovation of 17,000 sq. ft. office space to house a 24 hour bank check processing center which included a UPS and backup generator.
Completion Date: August 2000

Silicon Energy
Alameda, CA
Renovation of 29,192 sq. ft. office space within a six week period
Completion Date: June 2000

Maitland Market Renovation T
Alameda, CA
Renovation of 2,500 sq. ft. retail space, including a market and deli.
Completion Date: May 2000

Metro One (Expansion)
Alameda, CA
Completely gutted and renovated 6,600 sq. ft. office area for a 24-hour call center.
Completion Date: May 2000

Old Republic Title Company
Alameda, CA
Renovation of 6,690 sq. ft. office space.
Completion Date: April 2000

Pepex BioMedical, L.L.C.
Alameda, CA
Renovation of 1,900 sq. ft. laboratory space.
Completion Date: March 2000

Teecom Design Group
Alameda, CA
Renovation of 6,240 sq. ft. office space.
Completion Date: February 2000

The Fields Group
Oakland, CA
Renovation of 9,360 sq. ft. office space.
Completion Date: February 2000

 

 

 

 

 

Simpata Expansion
Alameda, CA
Renovation of 3,070 sq. ft. office space.
Completion Date: January 2000

Data 911
Alameda, CA
Build out of 15,600 sq. ft. office space.
Completion Date: January 2000

Calimetrics
Alameda, CA
Build out of 1,800 sq. ft. laboratory space.
Completion Date: January 2000

Hilti Center
Oakland, CA
Renovation of 2,278 sq. ft. office space.
Completion Date: September 1999

Simpata
Alameda, CA
Renovation of 5,428 sq. ft. office space.
Completion Date: September 1999

One Camino Sobrante, "Schulz Building"
Orinda, CA
Complete exterior remodel and facade change to 10,000 sq. ft. building. Addition of elevator, new HVAC system, and surrounding landscaping.
Completion Date: August 1999

Operon Technology (Phase II)
Alameda, CA
Converted a warehouse to a shipping area and renovated an existing office space.
Completion Date: August 1999

BioMedicines, Inc.
Alameda, CA
Renovation of 5,044 sq. ft. office space.
Cornpletion Date: April 1999

Wiley, Price and Radulovich
Alameda, CA
Renovation of 3,307 sq. ft. office space.
Completion Date: April 1999

The Mechanics Bank of Richmond
Berkeley, CA
Build out of 900 sq. ft. "industrial looking"
commercial space for a bank branch. Work completed 7 weeks.
Completion Date: April 1999

Claremont Behavioral Services
Alameda, CA
Renovation of 2,300 sq. ft. office space.
Completion Date: January 1999

Gallagher PR Expansion
Alameda, CA
Renovation of 2,400 sq. ft. office space.
Completion Date: January 1999

Quality Support
Alameda, CA
Renovation of 2,800 sq. ft. office space.
Completion Date: December 1998

Optiscan
Alameda, CA
Converted an existing Lunch Room into a "wet" laboratory and open office area.
Completion Date: December 1998

Operon Technology
Alameda, CA
Converted a warehouse to a shipping area and renovated an existing laboratory.
Completion Date: November 1998

City of Alameda
City Hall Annex

Alameda Point, CA
Negotiated the upgrade of 20,000 sq. ft. 1940's U.S. Naval Administration Building for the Public Works and Engineering Department's. Project completed in 16 weeks.
Completion Date: November 1998

Metro One
Alameda, CA
Completely gutted and renovated 7,400 sq. ft. office area for a 24-hour call center. Including UPS and emergency power generator.
Completion Date: October 1998

Safeway Distribution Center Bakery Building
Richmond, CA
Addition of 4,000 sq. ft. building to house a new state of the art automated oven system.
Completion Date: April 1998

Gallagher PR
Alameda, CA
Renovation of 3000 sq. ft. office space.
Completion Date: March 1998

The Woolcott Group
Alameda, CA
Renovation of 1400 sq. ft. office space.
Completion Date: March 1998

E.D.F.U.N.D.
Alameda, CA
Renovation of 2,800 sq. ft. office space.
Completion Date: March 1998

Mission Bell Apartments and Stores
San Leandro, CA
Renovation of a four-story split-use commercial and apartment building. Complete facade upgrade with extensive structural work.
Conpietion Date: May 1997

City of Alameda West End Branch Library
Alameda, CA
Upgraded library to meet the "Americans with Disabilities Act" accessibility requirements while also maintaining historical status.
Completion Date: May 1996

Mechanics Bank at Safeway
Moraga,CA
New 225 sq. ft. banking kiosk within a Safeway store. Project was completed in a 28- day period, 2 days ahead of schedule, while normal store operations continued. Customer safety was paramount.
Completion Date: April 1996

 

back to top

Design Build References

Law Offices of William Berg & Associates
T
Alameda, CA
Remodel of 6,000 sq. ft. of existing administrative offices. Includes voluntary seismic upgrade to the (E) structure while maintaining the historic character of the building's muraled ceilings.
Design/Build Team: Buestad Construction, Inc., Thruston Design Group, and Baseline Engineering
Completion Date: September 2001

Perforce Software "Perfortress"
T
Alameda, CA
Renovation of a two story, concrete tilt-up building of approximately 26,000 sq. ft. Extensive seismic retrofit completed during construction, with custom finishes throughout second floor office space.
Completion Date: "March 37th 2001" (April 7th)

The Mechanics Bank Training Center
Hercules, CA
Remodel of 2,800 sq. ft. existing warehouse/maintenance area to serve as a training center.
Design/Build Team: Buestad Construction, Inc.
Completion Date: March 1997



Good Chevrolet
Alameda, CA
Design/Build office remodel: Structural modifications and installation of new systems with a new office layout.
Design/Build Team: Buestad Construction, Inc. and Clausen Engineering
Completion Date: April 1996

Design/Build seismic retrofit: Steel moment frames were installed in the parts and service areas. Dealership continued to operate throughout course of work.
Design/Build Team: Buestad Construction, Inc. and Clausen Engineering
Completion Date: June 1994


Larry Bolton Insurance Offices
Alameda, CA
1996 Park Street Business Association Design Award received for this renovation and seismic upgrade of 1,875 sq. ft. building. Styled to resemble a 1920's period commercial building.
Design/Build Team: Buestad Construction, Inc. and Clausen Engineering
Completion Date: November 1993

back to top

Seismic References

Merchants Parking Garage Seismic Renovation
Downtown Realty Company

Oakland, CA
Seismic upgrade to parking structure in downtown Oakland.
Completion Date: July 1995

Ratto Building
Oakland, CA
Renovation of an existing two-story commercial office building of unreinforced masonry construction in order to have the building removed from the City of Oakland's "Potentially Hazardous URM List."
Completion Date: June 1992

City of Alameda Alameda Fire Station No. 2
Alameda, CA
Modification of a historically significant fire station to bring it up to current seismic safety standards. Station remained operational during the course of the work.
Completion Date: June 1992

Bill Cox Cadillac
Oakland, CA
Removed and replaced seismically damaged wall, 26 ft. x 80 ft. Shored roof structure during replacement.
Completion Date: March 1990

back to top

Industrial References

Chemical Compounding
Oakland, CA
This project entailed the conversion of a warehouse to a facility for the manufacture of specialty chemicals. It featured the installation of tall engineered partitions, containment pits for chemical spills, and the addition of concrete ramps and parking areas. The plumbing and electrical systems were upgraded to suit the new requirements. The owner had a move-in deadline and the work was completed in 6 weeks.
Completion Date: July 1994

PraxAir
Hayward, CA
Plant Closure. The purpose of this project was to bring the building back to original condition prior to tenant taking occupancy. Work consisted of patching the roof and ceiling where machinery had been removed. Infills were made to exterior tilt-up walls where the conduit and sleeves had been removed.
Completion Date: June 1993

Nabisco Foods
Oakland, CA
Prepare building for plant closure and sale. Coordinated with removal of custom food processing line. Work included cleaning 20' in diameter by 40' tall wheat storage silos and the patching of holes left by equipment.
Completion Date: December 1992

back to top

Client List

A.T.I.
Alameda Credit Union
Alameda Ferry Terminal
Alameda First National Bank
Alpha One Pharmaceutical, Inc.
American Protective Services
Aquanautics
Autodesk, Inc.
Bel Aire Plaza
Bill Cox Cadillac
BioMedicines, Inc.
Boy Scouts of America
California Glass Company
Calimetrics
Casa Carlitas
Charles Schulz Estate Properties
Chimes Block Building
City of Alameda
Claremont Behavioral Services
Data 911
Denim & Diamonds/Hot Rod Café
Dong Ling Sprouts, Inc.
E.D.F.U.N.D.
El Peralta Center
First Samoan Congregational Church
Fowler Building
Gallagher PR
Gallagher PR III
Good Chevrolet
Hilti Center
Imperial Bank
J&J Market

J.L. Associates, Inc.
John Beery Organization
Lakeside Plaza
Larry Bolton Insurance Offices
Law Offices of William Berg & Associates
Lindsey Properties Driftwood Apts.
M.A.C. Building
Maitland Market
Metro One
Mission Bell Apartments & Stores
Oakland Hills Tennis Club
Office Please, Inc.
Old Republic Title Co
Operon Technology
Optiscan
Park Professional
Pepex BioMedical, L.L.C.
Perforce Software
Quality Support
Safeway Distribution Center
Silicon Energy
Simpata Expansion
Tai Lan Building
Teecom Design Group
The Fields Group
The Mechanics Bank
The Woolcott Group
Victoria Impex
Wave Crest/Lanai Apts
Wiley, Price & Radulovich
Zim’s Restaurant


Home | Staff Profile | Job Opportunities
Residential Projects | Commercial Projects | Maritime Projects
Historical Projects | Fire Restoration | References