Welcome to buestad construction inc.

BUESTAD CONSTRUCTION, INC.
Residential - Commercial - Industrial - Maritime
License B380376
Since 1948

Corporate Office
768 Stewart Court -- Alameda, CA 94501
Phone (510)523-1925 -- Fax (510)523-2085

About Us
   
Projects
   
Contact Us
   

= view a photo
T = read a testimonial

Maritime References

City of San Leandro
San Leandro Marina

San Leandro, CA
Structural repair and rework of a wood float system with covered berths.
Completion Date: May 1998

Marin Yacht Club
San Rafael, CA
Phase I:
Part of the on-going scheme to replace aged and damaged dock floats on the marina. The project involved removing and replacing old floats without disturbing the water or electrical systems or disrupting the operation of the club. These requirements mandated the use of a method of sinking the floats to place them in position. The old floats were removed by barge. There were 52 floats in total. The project duration was approximately one month.
Completion Date: November 1995

Phase II:
Removed old float system. Installed new Bellingham Marine system, approximately 120 floats.
Completion Date: 1994

Schoonmaker Point Marina
Sausalito, CA

Installed re-designed and strengthened hardware to the marina float system.
Completion Date: March 1990

Emergency Repair Work:
Completion Date: February 1989

Repair and Maintenance Work to the Marina float system:
Completion Date: December 1988
 

Grand Harbor Marina
Alameda, CA
Bathroom building:
Construction of the foundation for the restroom and laundry facilities.
Completion Date: February 1989

New foundation under yacht sales office:
Completion Date: February 1989

Gate Houses:
Construction of new concrete bulkheads and piles with metal gatehouse structures for secure entrances to the marina.
Completion Date: February 1989

Reconstruction of a pier for future harbormaster's office and fuel depot:
Completion Date: November 1987

Pittsburg Marina
Pittsburgh, CA
Repairs to the marina dock system.
Completion Date: August 1988

St. Francis Yacht Club
On the Marina

San Francisco, CA
Drove piles, reconstructed wooden dock system, installed new fire hose cabinets.
Completion Date: June 1987

Repaired and replaced concrete dock system and drove new piles:
Completion Date: December 1986

New marina promenade and interior office conversions:
Constructed temporary boat scales structure for the 1982 World Echells Championship.
Completion Date: March 1982


Home | Staff Profile | Job Opportunities
Residential Projects | Commercial Projects | Maritime Projects
Historical Projects | Fire Restoration | References